Car Park Resurfacing

Car Park Reconstruction & Resurfacing

Stoke-on-Trent, Staffordshire

Project Overview

Civils & Environmental were appointed to undertake extensive car park refurbishment and surfacing works at the facility in Stoke-on-Trent.

The project was developed to improve the condition, durability and appearance of the existing parking and circulation areas, addressing sections of deteriorated surfacing while creating a long-term solution capable of withstanding ongoing commercial vehicle traffic.

Working within an operational business environment, the project required careful planning to minimise disruption whilst delivering a high-quality finished surface throughout the site.

Scope of Works

The project included:

  • Site preparation and surface cleaning

  • Localised excavation and reconstruction works

  • Kerb installation and repairs

  • Weed removal and vegetation management

  • MOT Type 1 sub-base construction

  • Binder course installation

  • Surface course resurfacing

  • Edge detailing and tie-in works

  • Final reinstatement and finishing works

Existing Site Challenges

The existing car park had experienced deterioration in several areas due to age, traffic loading and surface wear.

Investigations identified areas requiring both structural reconstruction and resurfacing works to restore long-term performance and improve the overall condition of the site.

Additional challenges included:

  • Maintaining safe access throughout the works

  • Managing varying pavement conditions across the site

  • Integrating new surfacing with existing infrastructure

  • Delivering a durable finish suitable for commercial use

Surface beforeSurface before 2

Reconstruction Works

Where the existing pavement structure had deteriorated beyond simple resurfacing, Civils & Environmental carried out full-depth reconstruction works.

These works included:

  • Excavation of existing surfacing to depths of approximately 380mm

  • Installation of weed barrier systems

  • Construction of new MOT Type 1 foundations

  • Timber edging installation where required

  • New kerb installations complete with concrete bedding and backing

The reconstructed areas provided a robust pavement foundation capable of supporting future traffic loading while improving overall site longevity.

Surfacing Works

Following completion of the preparation and reconstruction phases, the site received a comprehensive resurfacing programme.

Works included:

  • Thorough mechanical cleaning of all surfaces

  • Application of K1-40 tack coat

  • Installation of binder course asphalt

  • Laying of AC10 surface course

  • Perimeter key detailing and tie-ins

  • Joint sealing and finishing works

Approximately 470m² of surfacing was incorporated within the refurbishment programme, creating a consistent and durable finished surface throughout the operational areas.


Solutions Delivered

Civils & Environmental successfully delivered:

  • Full car park refurbishment

  • Localised pavement reconstruction

  • Kerb and edging installations

  • Asphalt resurfacing works

  • Surface preparation and cleaning

  • Binder and wearing course installation

  • Site reinstatement and finishing works

Outcome

The completed works significantly improved the condition, safety and appearance of the facility's external areas.

By combining structural pavement reconstruction with high-quality asphalt surfacing, the project delivered a long-term asset improvement that will reduce future maintenance requirements while providing a professional and durable finish for staff, visitors and operational vehicles.

The scheme demonstrates Civils & Environmental's ability to deliver commercial surfacing and infrastructure projects efficiently while maintaining operations within live business environments.

tarmac resurfacedtarmac resurfaced 2

Services Provided

  • Commercial Surfacing

  • Car Park Construction

  • Car Park Resurfacing

  • Asphalt Surfacing

  • Kerb Installation

  • Groundworks

  • Pavement Reconstruction

  • External Works

  • Reinstatement Works

  • Commercial Infrastructure Maintenance

Finished surface

© 2023 All Right Reserved by Civils and Environmental Ltd

© 2023 All Right Reserved by Civils and Environmental Ltd

© 2023 All Right Reserved by Civils and Environmental Ltd

© 2023 All Right Reserved by Civils and Environmental Ltd