Civils and Environmental Ltd were appointed to deliver a commercial landscaping refurbishment scheme, including pond removal, ground stabilisation, gravel surfacing, planting installation, and reception area enhancement.

The project was designed to improve the visual appearance, safety, and long-term maintainability of the site’s main landscaped area and entrance reception zone, while managing risks associated with utilities, pedestrians, and HGV movements.


Pre-Construction Planning & Risk Management

Prior to commencement, the following control measures were implemented:

Utility & Service Identification

  • General utility searches undertaken

  • Company utility drawings requested

  • CAT scan required prior to groundworks

  • All underground services to be clearly marked before excavation

(CAT scan noted as not completed at document stage — to be undertaken prior to excavation works.)

Health & Safety Compliance

  • Full H&S documentation and RAMS completion

  • Chapter 8 barriers or Heras fencing installed

  • Segregation of HGV routes and pedestrian areas

  • Clear exclusion zones established

Given the interaction between heavy vehicles and pedestrians, traffic management and physical segregation were critical components of safe delivery.


Main Landscaped Area – Pond Removal & Ground Improvement

Vegetation Clearance & Pathway Removal

The first phase included:

  • Removal of trees and hedges surrounding the existing ponded area

  • General vegetation clearance

  • Removal of diagonal pathway

  • Responsible disposal of green waste

All hedge stumps were treated with high-strength weed/stump killer to prevent regrowth and reduce future maintenance requirements.

Pond Removal & Backfilling

The existing pond was decommissioned and removed.

Works included:

  • Draining and isolating pond infrastructure

  • (Electrician required separately for electrical disconnection)

  • Excavation and removal of pond liner and base

  • Backfilling using MOT Type 1 (10-ton allowance due to unknown depth)

  • Compaction in layers to reduce settlement risk

Proper backfilling and compaction ensures long-term ground stability and prevents future surface collapse.

Ground Preparation & Gravel Installation (162m²)

To improve drainage and reduce maintenance:

  • 100mm of existing grass and topsoil removed

  • Formation level prepared

  • Geotextile membrane installed

  • 100mm layer of clean gravel installed

Geotextile membrane prevents weed growth while allowing water infiltration, improving longevity and site drainage performance.

This system provides a durable, low-maintenance landscape finish suitable for commercial premises.


Installation of Circular Feature & Patio Area

Sandstone Circular Patio (1.8m Diameter)

A new circular feature was constructed to enhance visual impact and create a defined planting area.

Works included:

  • Excavation to suitable depth

  • Sub-base preparation

  • Installation of sandstone circular patio (1.8m diameter)

  • Alignment and finishing to level tolerance

Sandstone provides:

✔ Natural aesthetic appeal
✔ Slip resistance
✔ Long lifespan in external environments

Planting Installation

Within the new circular feature:

  • New plants and tree installed

  • Compost-rich root zone preparation

  • Tree staking for structural support

  • Backfill and watering

This enhances the professional appearance of the reception landscaping while promoting healthy root establishment.

Entrance Area – Gravel Installation (Approx. 145m²)

The entrance zone was upgraded to improve presentation and reduce ongoing grass maintenance.

Works included:

  • Removal of 100mm grass and topsoil

  • Preparation of subgrade

  • Installation of geotextile membrane

  • Installation of 100mm gravel surfacing (approx. 145m²)

All entrance hedges removed and treated with high-strength weed/stump killer to eliminate future regrowth.

The result provides a clean, professional, low-maintenance entrance consistent with commercial property standards.


Environmental & Safety Considerations

✔ Utility searches conducted prior to excavation
✔ Segregated working zones using Chapter 8 barriers
✔ HGV and pedestrian risk management
✔ Safe removal of pond infrastructure
✔ Weed prevention measures
✔ Controlled waste disposal

Where pond electrics were present, disconnection was identified as requiring a qualified electrician prior to removal.


Project Outcome & Benefits

✔ Removal of redundant pond and overgrown landscaping
✔ Improved drainage via geotextile and gravel system
✔ Reduced long-term grounds maintenance costs
✔ Enhanced visual appeal of reception and main grounds
✔ Stabilised ground conditions using MOT backfill
✔ Professionally finished circular sandstone feature

© 2023 All Right Reserved by Civils and Environmental Ltd

© 2023 All Right Reserved by Civils and Environmental Ltd

© 2023 All Right Reserved by Civils and Environmental Ltd

© 2023 All Right Reserved by Civils and Environmental Ltd