Commercial Landscaping & Pond Removal Works – Reception & Main Grounds Upgrade

Project Overview

Civils and Environmental Ltd were appointed to deliver a commercial landscaping refurbishment scheme, including pond removal, ground stabilisation, gravel surfacing, planting installation, and reception area enhancement.

The project was designed to improve the visual appearance, safety, and long-term maintainability of the site’s main landscaped area and entrance reception zone, while managing risks associated with utilities, pedestrians, and HGV movements.

Pre-Construction Planning & Risk Management

Prior to commencement, the following control measures were implemented:

Utility & Service Identification

  • General utility searches undertaken

  • Company utility drawings requested

  • CAT scan required prior to groundworks

  • All underground services to be clearly marked before excavation

(CAT scan noted as not completed at document stage — to be undertaken prior to excavation works.)

Health & Safety Compliance

  • Full H&S documentation and RAMS completion

  • Chapter 8 barriers or Heras fencing installed

  • Segregation of HGV routes and pedestrian areas

  • Clear exclusion zones established

Given the interaction between heavy vehicles and pedestrians, traffic management and physical segregation were critical components of safe delivery.

Main Landscaped Area – Pond Removal & Ground Improvement

Vegetation Clearance & Pathway Removal

The first phase included:

  • Removal of trees and hedges surrounding the existing ponded area

  • General vegetation clearance

  • Removal of diagonal pathway

  • Responsible disposal of green waste

All hedge stumps were treated with high-strength weed/stump killer to prevent regrowth and reduce future maintenance requirements.

Pond Removal & Backfilling

The existing pond was decommissioned and removed.

Works included:

  • Draining and isolating pond infrastructure

  • (Electrician required separately for electrical disconnection)

  • Excavation and removal of pond liner and base

  • Backfilling using MOT Type 1 (10-ton allowance due to unknown depth)

  • Compaction in layers to reduce settlement risk

Proper backfilling and compaction ensures long-term ground stability and prevents future surface collapse.

Ground Preparation & Gravel Installation (162m²)

To improve drainage and reduce maintenance:

  • 100mm of existing grass and topsoil removed

  • Formation level prepared

  • Geotextile membrane installed

  • 100mm layer of clean gravel installed

Geotextile membrane prevents weed growth while allowing water infiltration, improving longevity and site drainage performance.

This system provides a durable, low-maintenance landscape finish suitable for commercial premises.

Installation of Circular Feature & Patio Area

Sandstone Circular Patio (1.8m Diameter)

A new circular feature was constructed to enhance visual impact and create a defined planting area.

Works included:

  • Excavation to suitable depth

  • Sub-base preparation

  • Installation of sandstone circular patio (1.8m diameter)

  • Alignment and finishing to level tolerance

Sandstone provides:

✔ Natural aesthetic appeal
✔ Slip resistance
✔ Long lifespan in external environments

Planting Installation

Within the new circular feature:

  • New plants and tree installed

  • Compost-rich root zone preparation

  • Tree staking for structural support

  • Backfill and watering

This enhances the professional appearance of the reception landscaping while promoting healthy root establishment.

Entrance Area – Gravel Installation (Approx. 145m²)

The entrance zone was upgraded to improve presentation and reduce ongoing grass maintenance.

Works included:

  • Removal of 100mm grass and topsoil

  • Preparation of subgrade

  • Installation of geotextile membrane

  • Installation of 100mm gravel surfacing (approx. 145m²)

All entrance hedges removed and treated with high-strength weed/stump killer to eliminate future regrowth.

The result provides a clean, professional, low-maintenance entrance consistent with commercial property standards.

Environmental & Safety Considerations

✔ Utility searches conducted prior to excavation
✔ Segregated working zones using Chapter 8 barriers
✔ HGV and pedestrian risk management
✔ Safe removal of pond infrastructure
✔ Weed prevention measures
✔ Controlled waste disposal

Where pond electrics were present, disconnection was identified as requiring a qualified electrician prior to removal.

Project Outcome & Benefits

✔ Removal of redundant pond and overgrown landscaping
✔ Improved drainage via geotextile and gravel system
✔ Reduced long-term grounds maintenance costs
✔ Enhanced visual appeal of reception and main grounds
✔ Stabilised ground conditions using MOT backfill
✔ Professionally finished circular sandstone feature

More Projects

Boston, MA

New Pedestrian Access Gate & footway

Boston, MA

New Pedestrian Access Gate & footway

Boston, MA

New Pedestrian Access Gate & footway

Boston, MA

New Pedestrian Access Gate & footway

Boston, MA

Warehouse Drain repairs

Boston, MA

Warehouse Drain repairs

Boston, MA

Warehouse Drain repairs

Boston, MA

Warehouse Drain repairs

We are looking forward to working with you

We are looking forward to working with you

Let’s Discuss

Let’s Discuss

Schedule a Free Consultation

© 2023 All Right Reserved by Civils and Environmental Ltd

© 2023 All Right Reserved by Civils and Environmental Ltd

© 2023 All Right Reserved by Civils and Environmental Ltd

© 2023 All Right Reserved by Civils and Environmental Ltd