How to Replace Internal Warehouse Drainage Channels
How to Install a Reinforced Concrete Pad for Security Infrastructure
Concrete pads are essential for:
Card reader islands
Barrier systems
Access gates
Substation equipment
Step 1: Utility Checks & CAT Scan
Never excavate blind.
Benefit:
Avoids service strikes and delays.
Step 2: Excavation & Sub-Base
Excavate to depth
Install compacted MOT Type 1
Check levels
Benefit:
Prevents future settlement cracks.
Step 3: Reinforcement Installation
Reinforcement mesh:
Controls cracking
Increases load capacity
Improves durability
Spacers ensure correct cover depth.
Benefit:
Extends slab lifespan significantly.
Step 4: C40 Concrete Installation
C40 concrete provides:
High compressive strength
Resistance to vehicle loading
Industrial-grade durability
Proper curing is essential.
Benefit:
Reduces long-term cracking and maintenance.
4️⃣ How to Replace Internal Warehouse Drainage Channels
Internal warehouse drainage must withstand:
Forklift impact
Chemical exposure
High cleaning frequency
Step 1: Controlled Shutdown Planning
Dust containment
Area tenting
Segregation
Benefit:
Protects stored goods and compliance standards.
Step 2: Precision Cutting & Breakout
Clean edges prevent slab weakening.
Benefit:
Reduces crack propagation.
Step 3: Install Chemical-Resistant Channels
Industrial channel systems must:
Maintain proper fall
Handle chemical runoff
Support stainless steel gratings
Benefit:
Improves hygiene and drainage reliability.
Step 4: Reinstate with Fibre-Reinforced Concrete
Fibre reinforcement:
Reduces cracking
Improves load distribution
Benefit:
Handles forklift wheel pressure effectively.
Correct Methodology
Controlled shutdown
Dust containment
Precision cutting
Breakout
Chemical-resistant channel installation
Fibre-reinforced concrete reinstatement
Why This Is Important in Food & Manufacturing Units
Poor drainage leads to:
Standing water
Slip hazards
Hygiene risks
Regulatory non-compliance
FAQs – Internal Drainage
Q: Can drainage be replaced without shutting down the warehouse?
Usually a partial or phased shutdown is required to maintain safety and curing time.
Q: What is fibre-reinforced concrete?
Concrete containing fibres that improve crack resistance and durability.
Q: How long does replacement take?
Typically 3–7 days depending on scope.