How to Reinstate a Road in an Industrial Yard (Properly & Permanently)
Introduction
Road trench reinstatement in industrial environments is not just about filling a gap in the asphalt. In commercial yards subjected to:
HGV axle loads
Forklift turning forces
Constant braking stress
Standing water
… improper reinstatement will fail quickly.
Common failures include:
Reflective cracking
Settlement
Rutting
Edge fretting
Water ingress
Correct trench reinstatement protects structural integrity, reduces long-term maintenance, and ensures compliance with UK pavement standards.
Step 1: Confirm Utilities & Excavation Safety
Before any surfacing work begins:
Obtain statutory utility drawings
Conduct CAT scan
Mark out service routes
Hand dig first 150mm where required
This prevents service strikes, project delays, and safety breaches.
Benefit:
Reduces risk, protects workers, and prevents costly damage claims.
Step 2: Plane Out to Correct Depth (Typically 80mm–100mm)
Mechanical planing ensures:
Removal of compromised material
Clean vertical edges
Uniform reinstatement thickness
Prevention of weak bonding
In heavy-use yards, reinstatement depth is critical. A shallow patch will fail under axle load.
Benefit:
Extends pavement life and prevents early resurfacing.
Step 3: Install Structural Binder Course (60mm AC20)
AC20 binder course:
Distributes vertical loads
Provides structural strength
Resists deformation
It must be laid and compacted to achieve proper density.
Benefit:
Reduces rutting and subsidence under heavy plant traffic.
Step 4: Sweep and Apply K1-40 Tack Coat
A tack coat creates chemical bonding between layers.
Without proper bonding, layers can separate — especially in turning areas.
Benefit:
Prevents delamination and extends surfacing lifespan.
Step 5: Lay 40mm SMA10 Surface Course
Stone Mastic Asphalt (SMA10):
High stone content
Superior rut resistance
Strong skid resistance
Smooth finish
This surface is ideal for commercial yards and access roads.
Benefit:
Improves safety, durability, and professional appearance.
Long-Term Benefits of Professional Reinstatement
✔ Lower lifecycle cost
✔ Reduced reactive maintenance
✔ Improved drainage performance
✔ Stronger resistance to vehicle turning stress
✔ Compliance with SROH guidelines
Key Steps
Utility drawings & CAT scan
Mechanical planing (80–100mm depth)
60mm AC20 binder installation
Mechanical sweep
K1-40 tack coat
40mm SMA10 surface course
Edge sealing & compaction testing
Why This Matters in Cheshire
The North West climate brings:
High rainfall
Freeze–thaw cycles
Ground movement
Water ingress is the biggest cause of failure. Proper layer bonding and compaction is critical.
FAQs – Road Trench Reinstatement
Q: How long should a properly reinstated trench last?
A professionally reinstated trench in an industrial yard should last 10–15 years depending on traffic loads and drainage conditions.
Q: What causes trench reinstatements to sink?
Poor compaction, inadequate binder depth, and water ingress into the sub-base.
Q: Is SMA10 better than standard tarmac?
Yes. SMA10 provides improved rut resistance and durability in HGV environments.
Q: Do you cover trench reinstatement across the North West?
Yes — we operate throughout Cheshire, Warrington, Crewe, Manchester, and surrounding regions.